首页 > 资料下载 > 选定沥青基线病例的更新费用(2011年6月基础)Updated Costs (June 2011 Basis) for Selected Bituminous Baseline Cases
选定沥青基线病例的更新费用(2011年6月基础)Updated Costs (June 2011 Basis) for  Selected Bituminous Baseline Cases 选定沥青基线病例的更新费用(2011年6月基础)Updated Costs (June 2011 Basis) for  Selected Bituminous Baseline Cases

选定沥青基线病例的更新费用(2011年6月基础)Updated Costs (June 2011 Basis) for Selected Bituminous Baseline Cases

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

The latest series of baseline reports prepared for NETL was begun in 2004, and the report commonly referred to as the Bituminous Baseline Report (“Cost and Performance Baseline for Fossil Energy Plants, Volume 1: Bituminous Coal and Natural Gas to Electricity”) was first published in May 2007. The initial issue of the Bituminous Baseline Report used a cost basis of January 2007 dollars. The report was subsequently updated in August 2007 and again in November 2010. The cost basis was updated to June 2007 dollars in the November 2010 issue. Recently, the capital and O&M costs for selected cases were re-estimated using a cost basis of June 2011 dollars.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。