首页 > 资料下载 > 指导和影响CCS实施的联邦和省级监管框架和缺口概述(2012)overview of federal and provincial regulatory frameworks and gaps tha
指导和影响CCS实施的联邦和省级监管框架和缺口概述(2012)overview of federal and provincial regulatory frameworks and gaps tha 指导和影响CCS实施的联邦和省级监管框架和缺口概述(2012)overview of federal and provincial regulatory frameworks and gaps tha

指导和影响CCS实施的联邦和省级监管框架和缺口概述(2012)overview of federal and provincial regulatory frameworks and gaps tha

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

Project Pioneer will be one of the first carbon capture and storage (CCS) projects to utilize an integrated approach for CCS, and is expected to serve as a prototype for the long-term, commercial-scale application and integration of CCS technologies to achieve reductions in greenhouse gas emissions. The partners in Project Pioneer are TransAlta Corporation (TransAlta), Capital Power L.P. (CPLP), Enbridge Inc. (Enbridge), the Alberta provincial and Canadian federal governments, and the Global CCS Institute as a Knowledge Sharing Partner. Project Pioneer is being proposed to capture 1 million tonnes of carbon dioxide (CO2) annually from a coal fired power plant and transport the CO2 by pipeline to a sequestration field or to be utilized for enhanced oil recovery (EOR) in a depleted oil/gas field.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。